▍Fort Lauderdale Seawall Repair

Fort Lauderdale · Marine Construction

Rip Rap Installation in Fort Lauderdale

Stone toe protection that absorbs wave energy and shields the base of the wall from scour.

Rip rap is a layer of large stone placed at the base of a seawall. It breaks up wave energy from boat wake and storm surge and protects the toe from scour.

Broward County often encourages rip rap in front of seawalls as habitat, and it can be a condition of permits for some seawall projects.

Signs you may need rip rap installation

  • Exposed toe at low tide
  • High boat traffic in front of the property
  • Scour holes at the wall base
  • Wave reflection off the wall
  • Planning seawall repair or replacement
  • Permit conditions requiring toe protection

How the work typically goes

  1. Step 1

    Plan

    Determine stone size, footprint and permitting.

  2. Step 2

    Place

    Install filter fabric and stone along the wall toe, often by barge.

  3. Step 3

    Inspect

    Confirm coverage and stability.

Where we take requests

Rip Rap Installation requests are welcome across Fort Lauderdale waterfront, including Las Olas Isles, Coral Ridge, Rio Vista, Harbor Beach, Nurmi Isles, Seven Isles, Sunrise Key, Lauderdale Harbors and properties along the New River, Middle River and Intracoastal Waterway.

View service areas

Rip Rap Installation FAQs

Does rip rap require a permit?

+

Placement in the water generally requires permitting. Your contractor should handle the applicable approvals.

Will rip rap affect my boat dockage?

+

Rip rap extends out from the wall, so it's designed with your dock, lift and draft in mind.

Related services

Seeing cracks, lean or sinkholes?

Request a project estimate and get connected with a marine professional.

Call NowFree Estimate